Outdoor restaurant furniture for sidewalks, rooftops and courtyardsOutdoor furniture for street and rooftop restaurants. Tables and chairs carry an 8-piece minimum, in any combination.Talk to a specialist

Curb notes

Before the first warm week, settle six things with commercial outdoor furniture suppliers

In this guide

The season does not wait for freight. The first warm Saturday shows up whether the chairs have or not, and a sidewalk with no seating on that day is a sidewalk handing its crowd to the place next door.

So treat the outdoor order like a reservation book: work backward from opening day. Whoever you buy from, there are six things to settle before the season, and below is how each one works when you order with us.

A hub diagram with opening day at the top and three cards below it: samples, about four business days; order review, one business day; standard lead time, 14 to 21 business days. A note adds transit.
Samples, our reply and 21 business days of lead time come to 26 business days before transit.
Open diagram at full size (new tab) ↗
Read the diagram in text

A hub diagram with opening day at the top and three cards below it: samples, about four business days; order review, one business day; standard lead time, 14 to 21 business days. A note adds transit.

  • SEASON NOTES
  • Opening day: Count back. Transit comes first.
  • Samples: Confirmed in a business day, 2 to 3 more in transit.
  • Order review: Read by a person, answered within one business day.
  • Lead time: 14 to 21 business days, custom up to about 8 weeks.
  • 4 + 1 + 21 = 26 business days, about five weeks, before transit.
  • Samples, our reply and 21 business days of lead time come to 26 business days before transit.

Count back from opening day

Start with the date the first guest sits outside. Then take away time in this order.

Transit comes off first. We give it as an estimate on the freight quote, never as a promise, so leave slack. Then the build window, which runs 14 to 21 business days for anything in the standard range. Before that, a business day for our reply to your order. Before that, samples, if you need to see a color: a business day to confirm the request and 2 to 3 business days in transit by UPS Ground.

Add it up. Four business days for samples, one for the reply, 21 for lead time. That's 26 business days, five weeks and a day on a five-day week, and transit still sits on top. Holidays push it further.

Rule of thumb for a city patio: get the order in six weeks before opening, plus the transit on your quote. Ordering during the first warm week means opening on bare concrete.

Samples before the season, not during it

Color is where outdoor orders stall. An umbrella canopy picked from a screen looks different against your awning and your brick.

Our 9-foot aluminum market umbrella has an aluminum pole, fiberglass ribs, a push lift and a long list of canopy fabrics and colors. That's a lot to judge from a photo. Order swatches of the two or three you like from the free samples page and hold them up outside at noon and at dusk. The same goes for slat colors on a set and metal finishes on a frame.

The order, the read, the quote

Every order you send is read by a person here before anything is confirmed. Nothing is charged at that point. You get back one email holding the confirmed lines, a freight number for every address, and the way to pay.

Standard orders are paid before they ship, so the payment date is part of the timeline too. A check in the mail takes longer than a card. Build that in.

Custom work runs on a longer clock. Think of a fabric outside our listed options, a special-order stain, or a top cut to an odd size. Those can stretch to about 8 weeks. They start with a 40% deposit, and once we confirm one, it stays: no cancelling, no sending it back. If the patio opens in six weeks, stay with standard items.

Freight to a curb, a dock or a roof

Outdoor furniture ships as palletized freight. Standard service stops where the truck stops: your dock, or the tailgate, at a business address. Everything past that point, the carry, the stairs, the cardboard, belongs to your crew.

That matters most on a rooftop. No driver hauls pallets up a stairwell, and nobody on the truck unboxes or assembles a thing. If the pallets need to come down off the truck at a curb, book a liftgate. If they need to go through the building, book inside delivery. Book either one on the order itself, at extra cost. The same goes for a residential address or a site with restricted access.

Weigh the heavy pieces before you plan the carry. This black cast iron umbrella base is 95 lbs on its own. Four of them is 380 lbs of iron headed for the roof, before a single chair.

Two locations means two quotes, since each delivery address is priced separately. For a site in Canada, your customs broker clears the freight, and brokerage, duties and Canadian taxes sit with you. The delivery page lays out every service and charge. A big patio can also come on more than one truck. Treat the second truck exactly like the first. Questions on any of this can go to sales@outdoorrestaurantfurniture.com with FREIGHT and your project name at the start of the subject line.

Unloading day on the sidewalk

Here's the mistake that costs the most money: one person signs for twelve pallets in a hurry, and the crushed carton at the back turns up two days later.

Plan two people at the curb, free to start unloading within half an hour of the truck pulling in. Tally what came off against the bill of lading, pallet by pallet, carton by carton. Anything torn, crushed or missing goes onto that bill in ink, before your name does. Short on time for a proper look? Add "subject to inspection" beside the signature.

Then the clock starts. Damage you find inside a sound carton after the truck leaves has a 24-hour window. Shortages and defects: three days from receipt, reported to us by email. Photograph everything, and keep the broken cartons until the claim closes. We help you put the carrier claim together.

Book the call before the rush

Some questions are easier by voice: a rooftop with a freight elevator, a second location in Canada, a mix of standard and custom. Weekdays, one of our specialists will ring you back. Use the callback form and choose morning, midday or afternoon, Central time: the earliest window opens at 8 AM and the last closes at 6 PM.

While you wait, lay out the season. Size the shade from the patio umbrellas, price the evening chill with a 40,000 BTU stainless steel patio heater, and pick sets from the outdoor furniture sets. The guide to commercial patio sets shows how to turn that into order lines, and the outdoor restaurant seating guide covers the layout. Then circle the order date, six weeks out plus transit, on the calendar by the host stand.

Browse furniture

Furniture in this guide

Outdoor pieces from this guide

Open a product to check its current options and listed price. Review the selected size and finish before adding it to your plan.